21-06-2019, 09:28
Stalin’s tunnel opened in Vladivostok
Stalin’s tunnel has been officially opened in Vladivostok. People was waiting for it to happen for 2,5 years - the last train has went through the tunnel on September 30, 2016. Since then, the tunnel was being reconstructed. Builders had to work hard and in difficult technical and geological conditions.
The construction was built back in 1935, being one of the oldest railway tunnels in the Far East. Suburban trains going through it were transporting 1/6 of passengers of the Far East region, which leads us to 1,100 million people. The reconstruction was being planned to start in 2008, but for some reason, it was postponed.
Now the ply of suburban trains has been renewed.
News source: www.vestiprim.ru
Similar news
-
25.12.2018 The reconstruction of the strategically important Vladivostok railway tunnel is nearing its final stage. Video Maxim Galenica
-
12.01.2017 Six National Conservation Areas are located on the territory of Primorsky region
-
09.11.2016 210-metre-high skyscraper will be built in Far East of Russia.
-
28.03.2016 Narvinsky tunnel was solemnly opened in the Khasan district
Add a comment
Last program
-
First year medical university students are studying medicine’s bases
- «Vest: Primorye. Interview»: Primorye residents consume more fish than other residents of Russia
- 13 young specialists started working in outpatient clinics and policlinics of Primorye
- «The Pulse. Healthy Primorye»: feldshers and nurses
- Mysterious Dersu cliff attracts tourists from all over the world
- «The Pulse». The main hospital of Pozharskii area